- Nuclear Power and related projects such as Heavy water Plants, nuclear fuel complex, rare earths.
- River valley projects including hydel power, major irrigation and their combination including flood control.
- Ports, Harbors, Airports (except minor ports and harbors).
- Petroleum Refineries including crude and product pipelines.
- Chemical Fertilizers (Nitrogenous and Phosphatic other than single superphospate).
- Pesticides (Technical).
- Petrochemical complexes (Both Olefinic and Aromatic) and Petro-chemical intermediates such as DMT, Carprolactam, LAB etc. and production of basic plastics such as LDPE, HDPE, PP, PVC.
- Bulk drugs and Pharmaceuticals.
- Exploration for oil and gas and their production transportation and storage.
- Synthetic Rubber.
- Asbestos and Asbestos products.
- Hydrocyanic acid and its derivatives.
- (a) Primary metallurgical industries (such as production of Iron and Steel, Aluminum, Copper, Zinc, Lead and Ferro Alloys).
- Chlor-alkali industry.
- Integrated paint complex including manufacture of resins and basic raw materials required in the manufacture of paints.
- Viscose staple fiber and filament yarn.
- Storage batteries integrated with manufacture of oxides of lead and lead antimony alloy.
- All tourism projects between 200m-500 meters of High tide line or at locations with and elevation of more than 1000 meters with investment of more than Rs. 5 crores.
- Thermal Power plants.
- Mining projects (major minerals) with leases more than 5 hectares.
- Highway projects.
- Tarred Roads in Himalayas and/or Forest areas.
- Distilleries.
- Raw skins and hides.
- Pulp, paper and newsprint.
- Dyes.
- Cement
- Foundries (individual)
- Electroplating.
NOTE : Refer notification "The Environmental Impact Assessment Notification, 1994".